Project Description: Maximum Demand or Peak Demand typically makes up 25% – 35% on the energy bill in factories. Having an energy management system with high data capture rates, allows for better prediction of these high demand and inevitably allows for clients to reduce their bills through Peak Shaving.
RK South Asia is a prominent chain manufacturer with a global market footprint. Reneon was engaged to deployed 2 units of power meter at the incoming of the facility as well as configure a Maximum Demand (MD) alerting threshold to assist the client to manage their electricity bill.